Will the consultant be preparing traffic control plans?

Answer

The consultant will be responsible for preparing basic traffic control plans as part of the plan deliverables for the various waterline segments. The selected contractor(s) will be responsible for detailed traffic control plans, to be reviewed and approved by the design team, for construction.